1st March 2010

New Row / St Martins Lane WC2

Refurbishments, Dry Rot, Timber Treatments, Structural Waterproofing – Commercial Contract

Following major refurbishment works by Liquatek which have included – Timber Treatments, Dry Rot Treatment,   Basement Waterproofing and Window Refurbishments, we are now in the final phase of this contract.  Remedial works to party walls are now in progress resulting from on-going condstructions.  Secondary glazing has been ordered and is being manufactured  for installation.

St Martins Lane - Windows 031St Martins Lane - Windows 030

———————————————————————————————-

Our work in Walton, Somerset is continuing to a Grade 11 listed village house which is under going a major refurbishment.  Liquatek are working alongside the conservation authorities with regards to the refurbishment of this old building.  We are currently in the structural phase of renewing defective bearing timbers in the roof voids.  We are also carrying out damp proofing works, waterproof membrane works to the lower parts and floors and specialist timber treatments throughout the house.

IMG_1837IMG_1832IMG_1826DSC00615

Refurbishment & New Build – Cambridgeshire

Posted on Sep 30th, 2009 by steph

We are delighted to be involved with the refurbishment of an existing property and adjacent new build for private clients in a picturesque  hamlet between Cambirdge and Ely.  Liquatek have been involved  with the refurbishment of the existing house from the stripping out and demolition works, through the specialist timber treatments and damp proofing and will continue with final stages of the build.  The clients are also constructing a new property adjacent and we are currently involved in the design of a basement for this project with installation due to start in around 8 weeks time.  We are pleased to be able to offer our services which incorporate all aspects of the design and installation of below ground waterproofing systems.